N7,014,611 is the contract sum on the first borehole award in the package. It is the contract sum on the second award, and on the tenth, and on the fortieth. A SecretsReporters review of the Ebonyi State award records shows that the sum never moves: on 17 October 2025, the State Ministry of Education published 75 borehole contracts, for 75 different primary schools, awarded to 21 different companies, and every one of the 75 carries the identical price of N7,014,611, to the last naira.
The 75 borehole contracts sat inside a single release. The records carry an award time of noon on 17 October 2025 and a release time of one o’clock the same afternoon, and in that one hour the Ministry of Education published 111 award records carrying N6,061,527,512 of contracts for the 2025 budget year. Every record in the release falls inside the tenure of Governor Francis Ogbonna Nwifuru, who took office on 29 May 2023.
Each borehole contract carries the same title, with only the school changed at the end of it: Provision of 73 Nos. of 6 Diameter Motorised Boreholes with 3,000 Litres Over Head Tank. The record for Oferekpe Agbaja Primary School in Izzi Local Government Area, awarded to Nina-Davito Nig. Ltd, carries that title in full, and its contract page sets the item quantity at 73, in units of Nos, for the one school. The contract was signed at noon on 17 October 2025, the hour of the award itself, and runs for 123 days to 17 February 2026.
Taken on their own words, the 75 contracts buy 73 boreholes apiece: 5,475 boreholes for 75 primary schools. Divided across the quantity each contract states for itself, the identical sum prices a motorised borehole with a 3,000-litre overhead tank at about N96,000. The 75 contracts together carry N526,095,825.
The awards rotated through a small pool. Zugbe Global Investment Ltd took seven of the borehole contracts and Angel of Wonders Nig. Ltd took seven. Six companies took six each: Nina-Davito Nig. Ltd, DVK Prime Project Ltd, Friendship Express Nig. Ltd, Walmek Systems Ltd, Vivanna Nig. Ltd and Ekaprin Nig. Ltd. Stem-Tech Nig. Ltd took five, Febiks Multiservices Ltd took four, DBL General Merchandise Ltd took three, and Utmost Engineering Nig. Ltd, Koton Okenwa Ltd and I.B Ngbogo & Sons Ventures Ltd took two each. Seven further companies took one each. One school, Akpeguamofia Ngbo, appears twice in the series, its borehole contract awarded to Friendship Express Nig. Ltd both times at the identical sum.
The classroom contracts in the same release repeat the pattern at a larger figure. Twenty-six records carry one identical price of N170,000,000 each, N4,420,000,000 in all. Twenty are titled Construction of 1 Blocks of 12 Classroom One Storey Building with Office and Toilets, one block for one named school; six are titled Renovation/Reconstruction of 6 Blocks of 12 Classrooms Storey Building, each title carrying six blocks for a single school. Koton Okenwa Ltd and Chevenachi & Morel Ltd took three each, Mosaku Ltd and DBL General Merchandise Ltd took two each, and sixteen companies took one each. Inside the series, Azuiyiokwu Urban Primary School appears twice: once as a record carrying N0 with no contractor named against it, and once at the identical classroom price, awarded to Koton Okenwa Ltd.
Three consecutive records in the same release price the same vehicle. Each carries the identical title, Procurement of 2024 Double Cabin Pick up (Toyota Hilux 2024) Ebonyi SUBEB. The first, awarded to Kabuwol Integrated Global Nig. Ltd, is priced at N160,000,000. The second, awarded to Carjust Real Business Ventures, is priced at N160,000,000. The third, awarded to P-Excel Global Tech.Ltd, is priced at N39,646,303. The identical vehicle, under the identical description, in three records standing one after the other, carries two prices more than four times the third, with N120,353,697 between them.
Section 21(1) of the Ebonyi State Public Procurement and Related Matters Law 2020 provides that all public procurements shall be conducted by open competitive bidding, in a manner which is transparent, timely and equitable, and which promotes competition, economy and efficiency. The records SecretsReporters examined style every contract in the release an open tender. The prices that process produced are identical to the naira across different schools, in different parts of the state, awarded to different companies.
Three of the companies in the borehole pool stand on the Corporate Affairs Commission register as inactive companies: DVK Prime Project Limited, Zugbe Global Investment Limited and Febiks Multiservices Limited. Between them, the three hold 17 of the 75 borehole contracts.





The documents close on the Oferekpe Agbaja record. Its implementation page names the payer as the Ministry of Education and the payee as Nina-Davito Nig. Ltd, and its last lines carry the full contract sum as Amount Paid, with the Balance to be paid entered as N0.
Follow Secrets Reporters on WhatsApp: join the channel for every exclusive the moment it publishes.